April 26, 2010

KKTM Kemaman Overview:



Accommodation Area - Construction in Progress



Some Workshop and Laboratory Building



Academic Building



More Workshop & Laboratory still in progress


Library Building


Fabrication Workshop - Education and Industry 



Fabrication Workshop - will be used for Vessel Project 

April 24, 2010

Xcident Story...

1st strory: 27 Mac 2010, Sabtu
- Ni libatkan ayah aku ngan 1 family la. on d way from Kedah nak ke Grik, 700pm.
- on d way dekat2 baling, segerombolan lembu dengan selumbernya telah membuat roadblock di tengah2 jalan withou any alert sign.
- suddenly dalam kegelapan maghrib, around 100kmh ayah aku telah menghentam mereka dan ahli keluarga mereka dan sekor lembu telah mati di tempat kjadian.
- Alhamdulillah suma insan selamat. Pray to Allah...

Mission Failed. haha...

- terpaksa panggil toe-truck bawak p balai and workshop.

Wshop at Gurun

Day after xcident

Penangan Lembu.. oh...


Enjine prob skek... habih suma kena buka...

Repair in progress

Interior Alhamdulillah ok..

Some wiring and electronic component.... hoh..

2nd story: 23 April 2010, Friday
- 830am, macam biasa bersiap nak ke office, meneruskan saki baki intern prog...
- Daripada Sg Ramal.. on the way, traffic jam lak kt kajang. tiba2 Boom...
- tengah mencari dimana bunyi itu, tiba2 kereta aku dihentam dan menghentam.. wo...
- 1 big lorry (trailer) telah hentam sama itu small lorry dan lori telah menghentam van dan van telah menghentam aku dan aku telah menghentam keta depan..
- 5 bijik, hadui...
- Trailer(big lorry) dan small lorry telah cabot melarikan diri... ceh, x sempat aku nak bergambar...

Gambar tempat kejadian


Blakang keta drempuh van bawak makanan.

Zoom skek


KAL9090


Mata dah sepet sebelah.

Van yg hentam aku, BHQ914

blakang van yg telah dihentam oleh si lorry kecil

keta yg aku hentam.. hadui, baru kuar kedai ni bang...

skek ja aku hentam. x banyak. sory no...


zoom skek... bumper ja rosak... alhamdulillah...

- Alhamdulillah... aku chat. keta ja sakit...
- iman pun sakit gak.
- hadui... terpaksa amik emergency leave 1 hari...


April 21, 2010

Planning and Cost Control Engineer

20 April 2010, Tuesday

My Working Devision.

- Mr Azdi Abass, Managing Director assign me as Planning and Cost Control Engineer for the KKTM Kemaman project.

- Scope of work:
   1. Clarify interfaces, approvals, and client requirement for this project.
   2. Describe the main principles and documents used for each related activity.
   3. Control of project cost by utilizing established procedures for the preparation of definitive coded budgets, timely collection of cost data and expenditures, periodic reporting of cost information, and recommendations for cost control action.

- Duties:
   1. Inform the Project Manager and the Project Director of the cost status of the overall project and provide them with forecast trend and cost data necessary to control / minimize the costs of the project.
   2. Inform Field Management of the cost status of its field budget and provide it with the forecast trend and cost data necessary to control field performance.
   3. Impress upon all departments of the Engineering Center to be Project Cost conscious. Each Department Head remains directly responsible for the costs of work originating from his own Department.

- Interesting picture that I stole from the pc. Design of Produced Water Skid. hehe....

 Produced Water Skid 

Top View

Schematic Diagram of the Skid

April 20, 2010

ASIA WASTE WATER TREATMENT EXPO 2010

8 April 2010,

- Mr Azdi, MD ask me to visit Asia Waste Water Treatment at KLCC Convention Centre.
- Objective:
  1. Learn about Waste Water Treatment
  2. See the difference process of waste water treatment
  3. Find vendor and catalog of equipment needed for KKTM Kemaman project. (Pump, valve, skid etc)
  4. Learn the latest technology regarding water process

KLCC

Motor robot use for detection any lacking inside the pipe

Water Treatment Process: Technology from Japan

Forgot Already... haha...

King of Valve... hentam saja... haha

Pump: Cut Away Model

Forgot also... Mb Pump, Taiko model


April 6, 2010

Internship @ Octagon Petroleum

Company Profile: Octagon Petroleum Technology Sdn Bhd
- Specialized in education, training, engineering consultancy, and petroleum industry research.
- Managing Director: Mr. Azdi bin Abass
- Current Project: KKTM Kemaman - Setup curriculum and program for Oil and Gas Education, Training and Competency.

5 April 2010, Monday
- Register as trainee at Octagon Petroleum Technology (OPT)
- Under Technical Devision, person incharge: Mr Mohd Nizam, Mech Engineer

1st Day Meeting

- len2 komen:
- susah nk update blog, rumah x de internet.
- update blog dalam office ja.
- hahaha...
- ni pun curi2 ayam ja, bos x datang lagi.
- shhh....
- dulu study enjoy ja, lepak2 ja.
- skunk baru faham ketensenan orang keja.
- macam malas ja nak keja lepas grad.
- hadui...
- pa2 pun doa untuk aku and ummat.
- MODE: slek nonggeng-nonggeng

>
Inlet Separation Module